Madhya Bhotekoshi Jalavidyut Company Limited

A 102 MW run-of-river hydropower company developing the Middle Bhotekoshi Hydroelectric Project in Sindhupalchowk, Bagmati Province.

102 MW Run-of-River Hydropower Project

MBJCL is a subsidiary of Chilime Hydropower Company Limited and was established to develop the 102 MW Middle Bhotekoshi Hydroelectric Project on the Bhotekoshi River in Sindhupalchowk.

Official NameMBJCL
ProjectMBKHEP
Installed Capacity102 MW
Configuration3 x 34 MW
Project TypeRun-of-River
LocationSindhupalchowk
Company EstablishedJuly 2010
Annual Energy542.2 GWh
Madhya Bhotekoshi 102MW headworks and alpine river valley
Desanding settling basin reflecting the Himalayan mountains
High-voltage switchyard and transmission towers
Engineering and leadership site inspection at the intake weir
Powerhouse control room and turbine generator hall inspection

Role and status

Madhya Bhotekoshi Jalavidyut Company Limited (MBJCL) was established as a public company in July 2010 to develop the 102 MW Middle Bhotekoshi Hydroelectric Project. The original financing structure was designed around 51% promoter shares and 49% public shares, with Chilime Hydropower Company Limited identified as the principal promoter. NEA documentation lists promoters including Chilime Hydropower Company, Nepal Electricity Authority, Nepal Araniko Hydropower, Sindhu Investment, Sindhupalchowk Hydropower, and Sindhu Bhotekoshi Hydropower.

SLV Group future growth outlook

Build the next chapter with SLV Group.

Explore our businesses, partnerships, and long-term opportunities across the group.